Newark, New Jersey
This task included field surveys of multiple bridges and ramps crossing over the New Jersey Turnpike from the Route 514 overpass north of Exit 10 to the ramps and overpasses at Exits 13A (Newark International Airport) and Exit 15E (Newark). BANC3 established horizontal and vertical control and surveyed points at each gutter line, curb line, lane stripe, and grade change at 25'± intervals and at any noticeable low/high point in the ramp's vertical alignment. We also surveyed drainage inlets, junction boxes, cover plates, lighting standards, start/ends of walls, curbs, barrier, guard rail, and approach slabs.