Various Locations, New Jersey
BANC3 provided field surveying and mapping of 35 miles of the Colonial Pipeline and for 24 miles of the Harbor Line Sunoco Pipeline, from the Greensboro to Linden Terminal Line, which were being affected by the roadway widening project along portions of the New Jersey Turnpike between exits 6 to 9. BANC3 established horizontal and vertical control utilizing GPS which was referenced to NGS monuments being used on the mapping for the widening project and performed locations of the 30" high pressure pipeline and all surface features and angle breaks at intervals along the tangents. BANC3 developed base maps of all pipeline alignments, fence crossings, secondary roads, markers, signs, utilities, and features for the Colonial Pipeline locations.